To facilitate the inspection and maintenance of the school-wide electrical equipment for the 2027 fiscal year, power outages will be implemented in different campus zones. During the outage, we kindly request cooperation from all units as outlined below.
1. In accordance with the academic calendar, four scheduled power outages will take place during the 2027 fiscal year. Please refer to the attached document (National Cheng Kung University 2027 High-Voltage Power Equipment Outage Inspection and Maintenance Plan) for the date, time and area of the 1st, 2nd, 3rd and 4th outages of this year. If the inspection and maintenance tasks are completed earlier or later on the scheduled day, power restoration will be adjusted accordingly, and no separate notifications will be issued.
2. Please inform Mr. Wu (ext. 50633) in advance if there is any construction work during the power outage to prevent accidents. On the day of power outage, please close the elevator and prohibit people from riding it.
3. Before the power outage, please shut down the equipment to avoid damage when the power is restored; after the power is restored, please assign personnel to inspect whether the internal power supply is normal. If you have any questions after the power is restored, please contact the 69KV high voltage duty room at 63066 or 63060.
4. On the day of the power outage, please assign staff to assist with gate opening to facilitate the maintenance work of each substation. Prior to the outage, please ensure the steel roller doors, electric locks and electric doors are open to prevent difficulty entering or exiting during the power outage. During the power outage, access control will be unavailable, so please plan accordingly.
5. The Computer and Network Center should be aware of the impact of network disruptions caused by power outages in the server rooms on each campus.
6. About the ATMs located on each campus, the Management Service Division should inform the post office, bank and other off-campus tenant units to assign their own staff to deal with the power outage and restoration.
7. During the power outage, the generator will start up. There will be a brief period of black smoke upon startup, which is a normal occurrence for a combustion engine.
8. The four scheduled outage dates have been announced in the academic calendar. If any events or activities are scheduled on the day of the power outage, please plan alternative arrangements in advance or reschedule them for another date.